Current Time: 15:26:04 EST
 

Archive for May, 2012

  • Mail901-920 and MySQL901-920 Migration (CP9) – Completed

    Step 2 of the CP9 Migration is ready to start (we told you the SysAdmins wouldn’t be sleeping until this is over).  We are finishing the last online syncs of Mail901 through Mail920 and MySql901 through MySql920.  After these complete–one at a time–they will be cut over to the new hardware.  Downtime will be less [...]

  • Mail502 Maintenance – Completed

    Mail502 will be going offline  so that we can move the contents of this server. The contents are being moved to another server with a newer, better performing raid card. These newer raid cards will help ensure that your data stays intact. In order to complete the final steps of moving the content, we have [...]

  • Web311 Maintenance – Completed

    Web311 will be going offline  so that we can move the contents of this server. The contents are being moved to another server with a newer, better performing raid card. These newer raid cards will help ensure that your data stays intact. In order to complete the final steps of moving the content, we have [...]

  • Scheduled Power and Phone Service Maintenance

    This Sunday on April 18th, from 6am to 9am EDT, we will have two maintenance operations taking place.  One by the power company for the building that houses the data center and call center.  The other maintenance is for the PBX and is a preliminary step towards a future improvement in customer support.  The power [...]

  • CP9 Database Optimization – Complete

    We are taking  another step toward the CP9 migration tonight, at Midnight EDT,  by conducting a database optimization on the current infrastructure. This is a necessary preparation step for the move. There may be slow reaction times accessing your control panel as this occurs, however your websites and all other services running will not be [...]

  • Mail501 and Mail502 – Emergency Maintenance – Resolved

    Mail501 and Mail502 have hard drive failures that need to be immediately addressed.  Any postponement of this work would be detrimental to data integrity.  The hard drives are part of RAID arrays that prevent any data loss, however the servers will experience slowness as the arrays are rebuilt with the new drives. Lisa Grice Director [...]

  • Web507 RAM Upgrade – Complete

    This needed to be done to improve the performance of the server. We notice there was some slowness in the server so we took care of the problem with this upgrade. We are expecting once the machine is brought back online there will be a file system check to make sure everything is ok.

  • web411 maintenance – Complete

    Web411 is being moved to new hardware for better performance, we apologize for the downtime while this necessary maintenance occurs.

  • Call Center and Live Chat Support Issues – Resolved

    We are currently experiencing issues with our internal help desk and live chat services. We expect the live chat service to be back up in the next hour with some reduced functionality with the service being completely restored by midnight tonight. Our phone representatives will be happy to assist you with any questions or issues [...]

  • Web512 FSCK – Resolved

    This server is going to be off line for a bit while we run file system check on this server.  We are doing this to make sure there are not system errors on this server because of load issues we have been having recently. Marcus Livers Senior Systems Technician

  • CP9 Outage – Resolved

    All of cp9 services are offline. We are currently working to bring them back online as soon as possible. Anthony Washington System Technician

  • CP9 Outage – Resolved

    All of cp9 services are offline. We are currently working to bring them back online as soon as possible. Matthew Almond Systems Administrator

  • Vacuum Running Behind CP6 – Resolved

    This process is usually set to run on the weekend, but since today was the first day of the new month the process ran. This is going to cause slowness to the customers that are behind cp6 and only for the control panel. Websites, databases, and email are not affected by this issue. Marcus Livers [...]

  • Scheduled Call Center Maintenance – Complete

    Our call center will be unavailable on April 1st, 7pm to 9pm EDT.  This is not an April fool’s joke.

 
© 2011 IX Web Hosting.